How Long Does a Modular Project Take, Phase by Phase?
A phase-by-phase look at a modular timeline, using the numbers from our build video.
Time is often the main reason people look at modular construction. Here is how the phases fit together, using the timeline shown in our build video. Every project is different, and we confirm the schedule for yours before work begins.
Phase 1: First call and site review
It starts with a 30-minute call about your land or project. From there, we review title, zoning, and what your municipality allows, then prepare a simple concept and budget range so you can decide whether to go ahead.
Phase 2: About 4 months in the factory
The building is fabricated indoors in our CSA-approved factory. In our build video, the modules spent 4 months in the factory. Building indoors keeps weather from setting the schedule.
At the same time: site work
While the modules are being built, your site is prepared. Factory and site work overlap, so one does not wait on the other. This is one of the main reasons a modular schedule is shorter.
Phase 3: Installation in 2 days
Once the modules arrive, they are set on the site. In our build video, the modules were installed in 2 days.
Phase 4: About 4 months to occupancy
After installation, the remaining work is completed on site. In our build video, it was 4 months from installation to occupancy.
The total: 10 months overall
Put together, the project in our build video took 10 months overall. Because scope, schedule, and price are locked before mobilization, the date you plan around is the date we work toward.
We are happy to walk through what these phases could look like for your site.