Factory-built projects create value in a different order than site-built ones. Understanding how that affects lenders, deposits, and draws is the first step to a financing plan that works.
Most construction financing in Canada was designed around a building that rises on its own site. Lenders release money as work is completed and inspected on that site, and the land and partly built structure serve as security along the way. Factory-built projects follow a different path. A large share of the building is produced somewhere else, often before the site is ready to receive it. That difference does not make modular projects harder to finance, but it does mean the financing plan needs to be built with the factory in mind from the start.
Start at feasibility
The financing question begins long before a loan application. At the feasibility stage, the project team decides whether a site and program suit factory production. The answers shape everything that follows:
- Unit mix and repetition. Factory production is most efficient when units repeat. A feasibility study should test whether the unit mix can be standardized without hurting the project's market fit.
- Transport and site access. Module sizes are limited by road rules and the site's ability to receive and crane them into place.
- Schedule. A shorter construction period changes interest carry, lease-up timing, and the project's overall returns. Those assumptions should be tested in the pro forma, not added later.
- Manufacturer fit. The plant's capacity, certifications, and track record matter to lenders and insurers, not only to the builder.
How the flow of money changes
In a site-built project, spending tends to follow the visible progress of the building on site. In a factory-built project, a large part of the cost can be incurred in the plant before anything arrives on site. Manufacturers commonly ask for deposits and progress payments during production. That creates a practical question for lenders: how do they advance funds against work that is not yet on the property they hold as security?
There are established ways to address this, and the right mix depends on the lender and the project. They include independent inspection of work in the plant, clear title arrangements for completed modules, bonding, and agreements that set out what happens to modules if a party cannot perform. The key is to raise these points with the lender early, before terms are set, so the draw schedule matches how the building will actually be produced.
Public programs that recognize modular
Federal programs have started to accommodate factory-built construction directly:
- CMHC mortgage loan insurance. CMHC states that modular construction can be used for any of its multi-unit mortgage loan insurance products. Requirements include that the modular manufacturer and its facilities be in Canada, that all modules be CSA certified, and that the manufacturer be an established organization with experience on projects of similar size. CMHC also requires appropriate bonding before authorizing advances during construction.
- Apartment Construction Loan Program. This CMHC program provides low-cost loans for rental housing through construction and into stabilized operations, with loans from $1 million up to 100 percent of the residential component's cost. Budget 2024 earmarked at least $500 million of the program for projects that use prefabricated or innovative building techniques.
- Build Canada Homes. Launched in September 2025 with an initial $13 billion, the federal agency was given a mandate to use bulk procurement and long-term financing to mainstream factory-built, modular, and mass timber construction.
Program terms change over time, so any project should confirm current eligibility and conditions directly with CMHC or the program administrator.
What lenders look for
Whether the lender is a bank, a credit union, or a public program, the questions about a factory-built project tend to be similar:
- Is the manufacturer established, certified, and adequately capitalized?
- Are the factory and site schedules coordinated, with clear responsibility at each handoff?
- How are deposits and progress payments protected?
- What bonding and insurance are in place, and who benefits from them?
- Do the design and approvals reflect modular delivery, or was it added late?
A project that can answer these questions clearly at the start will have a much easier path to approval.
Planning the whole path
The phrase "feasibility to factory" describes a single, connected process. The site study, the design, the manufacturer, the schedule, and the financing are not separate steps handed from one party to the next. They work best when they are planned together. When the financing plan is shaped by how the building will actually be made, factory construction's shorter and more predictable schedule can show up where it matters most: in lower carrying costs and an earlier date for income.