Canada's Housing Gap Is a Production Problem. Factory Building Can Help Solve It.
CMHC says Canada needs to roughly double its pace of housing starts for the next decade. Meeting that target will take more than policy. It will take a different way of producing buildings.
Canada does not have a shortage of plans for housing. It has a shortage of housing being built. The gap between the two is now large enough that the national housing agency has said, in plain terms, that the way Canada builds homes has to change.
The size of the gap
In June 2025, Canada Mortgage and Housing Corporation (CMHC) released an updated estimate of the country's housing supply gap. It found that housing starts need to reach around 430,000 to 480,000 units per year until 2035 to bring affordability back to levels last seen in 2019. CMHC projected that, on current trends, Canada would build about 245,000 to 250,000 units a year over the same period. In other words, the country needs to roughly double its pace of construction and hold that pace for a decade.
CMHC was also clear about what it would take. The report states that this level of building is only possible with a significantly larger workforce, more private-sector investment, and changes in technology and productivity, naming "more automation and modular construction" directly.
The regional picture matters for Western Canada. CMHC estimated that Vancouver needs about 7,200 more homes per year above its business-as-usual path, an increase of 29 percent, and that Calgary needs about 45 percent more homes per year, even after several years of record construction there.
Why more of the same will not close it
Doubling output is not only a question of approvals and financing. Someone has to build the buildings. BuildForce Canada, the national construction labour market group, projects that nearly 270,000 experienced construction workers, about one-fifth of the 2024 labour force, will retire between 2025 and 2034. Even with strong recruitment of younger workers, BuildForce estimates the industry could be short as many as 108,300 workers by 2034.
When the number of skilled people is the limit, building the same way with more projects in the queue does not produce more homes. It produces longer queues. The way out is to get more finished building from each hour of skilled work.
What changes when building moves indoors
Factory-built and modular construction move a large share of the work off the job site and into a controlled manufacturing setting. Walls, floors, and in many cases complete volumetric units are produced on a line, inspected, and then shipped to site for assembly while foundations and site work go ahead in parallel.
This changes several things at once:
- Work continues year-round. Indoor production is not stopped by snow, rain, or extreme cold, which matters in a country where winter can halt site work for weeks.
- Skilled labour goes further. Crews work at fixed stations with the tools and materials they need close at hand, instead of moving across scaffolding and waiting on other trades.
- Site work and building work overlap. The structure can be built at the same time as the site is prepared, rather than after.
- Quality is checked before delivery. Inspection happens in the plant, under good light and at working height.
The federal government has described the potential in similar terms. When it launched Build Canada Homes in September 2025, the Prime Minister's Office said the new agency would place an intense focus on factory-built, modular and mass timber methods, which it said have the potential to cut building timelines by up to 50 percent and reduce costs by as much as 20 percent. Results on any single project depend on design, site, and how early the factory approach is planned in.
Policy is moving in this direction
Public programs are starting to treat factory building as part of the core supply plan rather than a side experiment:
- Build Canada Homes was launched with an initial $13 billion and a mandate to use bulk procurement and long-term financing to bring these methods into the mainstream. Its first six federal sites are planned for 4,000 factory-built homes.
- Budget 2024 earmarked at least $500 million within CMHC's Apartment Construction Loan Program for rental projects that use prefabricated or innovative building techniques.
- CMHC's multi-unit mortgage loan insurance can be used for modular projects, with requirements that modules be CSA certified and built by an established Canadian manufacturer.
Where this leaves developers and landowners
For a developer or landowner in Western Canada, the question is no longer whether factory-built construction is credible. It is whether a given project is designed to take advantage of it. That decision is best made early, at the feasibility stage, when unit sizes, structure, transport limits, and the financing plan can all be set with the factory in mind.
Canada's housing gap is, at its core, a production problem. Production problems are what manufacturing is good at solving.
Sources
- CMHC, "Canada's Housing Supply Shortages: Moving to a New Framework," June 2025.
- CMHC news release, "CMHC releases latest housing supply gaps report," June 19, 2025.
- BuildForce Canada, 2025–2034 Construction and Maintenance Looking Forward national forecast.
- Prime Minister of Canada, "Prime Minister Carney launches Build Canada Homes," September 14, 2025.
- CMHC, Apartment Construction Loan Program.
- CMHC, Modular Rental Housing Construction.